Rules for Excavator Use of the Status Codesĭiscrepancy tickets are initiated by the excavator one of two ways they may either request it via the IVR when listening to the ticket statuses or request when viewing the status on Search & Status. Subsequent No Responses will be sent the next seven business days unless the ticket is coded with a valid status code.
#Maryland public utilities code code#
If a 48-hour delay is requested and there is not an updated response/status for that owner member district code by 11:59pm ET on the fourth business day after the day in which the ticket is transmitted then an initial No Response ticket will be sent to the affected owner member district code. Subsequent No Responses will be sent the next eight business days unless the ticket is coded with a valid status code. If a 24-hour delay is requested and there is not an updated response/status for that owner member district code by 11:59pm ET on the third business day after the day in which the ticket is transmitted then an initial No Response ticket will be sent to the affected owner member district code. A subsequent No Response will be processed and sent every business day at 11:59pm ET for the next nine business day OR until the ticket is coded with a 1 (clear/no conflict), 2 (marked), 5 (not complete/in progress), 9 (marked up to privately owned utility) or 10 (incorrect work site mapping, insufficient information, and/or wrong address) whichever comes first. For example, tickets taken on Monday must have a valid Ticket Check status code by 11:59pm Wednesday night to avoid a No Response. #Maryland public utilities code full#
No Response tickets are processed and transmitted to the call center’s PRISM database for transmission to the owner member at 11:59pm ET on the second full business day after the day in which the ticket is transmitted. If the ticket is not coded by 11:59pm on the second full business day following the day of the call, the locator will only be able to status with a code 1, code 2 or code 5, code 9 or code 10. Once the Discrepancy is processed, the status can be updated to code 1, code 2 or code 9. If the ticket is not expired/locked, the Discrepancy notice is allowed via the IVR or Search & Status. If code 10 is selected, it will be locked out as the final selection unless the excavator successfully processes a DISCREPANCY notice. If code 9 is selected, the only code it can be changed to is a code 1. If code 5 is selected, it can only be updated to a code 1, code 2 or code 9 If a ticket is statused with a code 5 within the ten business days from the original date of the call then an updated status of a code 1, 2 or 9 will be allowed until the one hundred twentieth (120) calendar days from the original call date. If code 4 is selected, the owner-member will be sent a “no response” every 24 hours until the ticket number expires or the ticket is coded as either a: code 1, 2, 5, 9 or 10. If code 3 is selected, the owner-member will be sent a “no response” every 24 hours until the ticket number expires or the ticket is coded as either a: code 1, 2, 5, 9 or 10.
If code 2 is selected, the only code it can be changed to is a code 1.The locator cannot change or delete a code 1 response. If code 1 is selected, it will be locked out as the final selection.Īltering the components of fuels that qualify a generating facility as a Tier 1 renewable source under the renewable energy portfolio standard by altering the definitions of "qualifying biomass" and "thermal biomass system". Making energy derived from waste-to-energy or refuse-derived fuel ineligible for the creation of credits under the renewable energy portfolio standard. Including a zero-emission energy resource as a Tier 1 renewable source eligible for meeting certain Tier 1 obligations under the renewable energy portfolio standard and requiring the Maryland Energy Administration, in consultation with the Public Se. Īltering the eligibility of solar energy sources for meeting certain portions of Tier 1 requirements of the renewable energy portfolio standard to require that the source is only eligible if it is connected with the electric distribution grid serving. Altering the definition of "Tier 1 renewable source" for purposes of excluding energy derived from qualifying biomass, methane from the anaerobic decomposition of organic materials, certain fuel cells, poultry litter-to-energy, waste-to-energy, refus.